ODU Visual Arts Building Roof Replacement
Project

ODU Visual Arts Building Roof Replacement

The scope of work is generally described as roof replacement, painting of exterior glazed CMU accents, steel framing, metal roofing, siding, and trim pieces. Existing built-up roof shall be removed down to existing steel deck and replaced with single ply membrane roof assembly. Renovate existing penthouse louvers/doors.

Francis Land House Phase II (Bathroom Renovation)
Project

Francis Land House Phase II (Bathroom Renovation)

Francis Land House Phase II was an interior restoration on the addition that was added to the historic Francis Land House in the 1970’s. TDSC was focusing on renovating the women’s bathroom and hallway area, the renovations were designed to give a clean new look to this historical landmark. The scope of the project encompasses...

Building SP-313 Roof Replacement & Exterior Wall Repairs
Project

Building SP-313 Roof Replacement & Exterior Wall Repairs

The work included the removal of the existing multiple ply ballasted built-up roof system down to the existing metal roof deck including flashings, copings, tapered insulation and incidental related work. Provided new modified bitumen roofing system, roofing insulation, flashings, copings, and wood nailers. The roof replacement included three (3) separate roof levels, comprised of an...